Permit Fees

Fees subject to change without notice.

All fees doubled for special hearing.

Building Permit Fees

(Based on Completed Cost of Construction)
Effective as of January 17, 2023

ApplicationAdministrativeFull Review
Appeal $350.00
Campground - Special Use $1,000.00
Certificate of Designation $500.00
Combination of Lots Agreement$200.00 
Conditional Use$300.00$600.00
Amendment to Conditional use$200.00$600.00
Exemption from Subdivision$300.00$600.00
Amended Exemption$200.00$400.00
Floodplain$150.00 
Rezoning $750.00
Rezoning Planned Development (PD) $1,500.00
PD Amendment (Minor) $750.00
PD Amendment (Major) $1,500.00
Rezoning Planned Development Overlay (PDO) $1,000.00
PDO Amendment (Minor) $750.00
PDO Amendment (Major) $1,000.00
Sign Placement$75.00 
Special Use $800.00
*For Wind, Solar and BESS, see the Wind, Solar and BESS fees section.
Amendment to Special Use$300.00$800.00
Variance$150.00$500.00
Vesting of Property Rights $200.00
1041 Regulation $5,000.00
Boundary Line Adjustments$200.00 
Amended Plats* $400.00
*Right of Way, Easement, Vacation,
Change to Condition of Approval(s),
or Plat Note
All Other Amended Plats$200.00 
Plat Correction$200.00 
Replat $400.00
Plat Vacation - No Public Infrastructure
or Dedication
 $400.00
Plat Vacation - Public Infrastructure or
Dedication
 $400.00
Temporary Uses and Structures$200.00 
Temporary Use-Temporary Dwelling (for 30 days)$5.00 
Human Burial$50.00 

Construction CostsFee
$0-$40,000$260.00
$40,001-$50,000$260.00 for the first $40,000 plus $6.50 for each additional $1,000 or fraction thereof
$50,001-$100,000$325.00 for the first $50,000 plus $6.50 for each additional $1,000 or fraction thereof
$100,001 -$500,000$650.00 for the first $100,000 plus $6.50 for each additional $1,000 or fraction thereof
$500,001-$1,000,000$3,250.00 for the first $500,000 plus $6.50 for each additional $1,000 or fraction thereof
$1,000,001+$6,500.00 for the first $1,000,000 plus $6.50 for each additional $1,000 or fraction thereof
**  All fees are doubled if enforcement ** 

descriptionFee
Finished floor area (including additions)                   $100.00 per square foot
Basement floor area (unfinished)$22.00 per square foot
Basement floor area (finished)$30.00 per square foot
Garage (attached)$37.00 per square foot
Carports$24.00 per square foot
Decks, covered porches, etc.$12.00 per square foot

 **  Fees may be doubled for Zoning and Building Permits if not obtained prior to start of construction. **

descriptionFee
Tenant finish                  Based on actual labor and material valuation
Remodel workBased on actual labor and material valuation
Shell buildingsBased on actual labor and material valuation
Full finish buildingsBased on actual labor and material valuation
apartmentsBased on actual labor and material valuation

 **  Fees may be doubled for Zoning and Building Permits if not obtained prior to start of construction. **

Factory Built Home, Manufactured Homes and Mobile HomeFee
Permanent Foundation$500.00 (with Manufactured Home Placement)
Foundation Only$300.00
Temporary Foundation$250.00
Trailer Park$150.00

descriptionFee
Administrative Review                       $350.00
Full Review$650.00
Preliminary Review$100.00
Appeal persuant to Sec. 4-860(F)(4)$500.00

descriptionFee
Preliminary Plan              $2,500.00 + $40 per lot
Final Plan$2,000.00

Miscellaneous Building Permits:Fee
RemodelBased on actual labor and material valuation
Reroofing$200.00
Mechanical$200.00
Demolition$100.00
House Moving$100.00
Zoning$200.00

Other Inspections and FeesFee
1. Inspection outside of normal business hours$100.00 per hour*
2. Reinspection fees assessed under provisions of Section 108.4$50.00 per hour*
3. Inspection for which no fee is specifically indicated$50.00 per hour*
4. Use of outside consultants for plan checking and inspections, or bothActual Cost**
5. Issuance of each temporary Certificate or Occupancy$250.00***
6. In-House plan review$250.00
* Or the total hourly cost to the jurisdiction, whichever is the greatest. The cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
** Actual Costs include administrative and overhead costs.
*** $100.00 shall be refunded if a Certificate of Occupancy is issued prior to the expiration.
**** Fees may be doubled for Zoning and Building Permits if not obtained prior to start of construction.

AcreageFEE
Up to 10.9 acres$725.00
11-20.9 acres$800.00
21-30.9 acres$875.00
31-40.9 acres$950.00
41-59.9 acres$1,025.00
60 acres +$1,025.00
Plus each additional 40 acres or fraction thereof over 60 acres$20.00

See Clerk and Recorder Fee Schedule.

DescriptionFee
Building Mounted Wind Energy Facility Application Fee$500.00
Ground Mounted Wind Energy Facility Application Fee$1.00/acre
(Minimum $5,000)
     Permit Fee$1,000.00/MW
Accessory Ground Mounted & Building Mounted Solar 
Collectors Facilities - Residential - Application Fee$500.00
Accessory Ground Mounted & Building Mounted Solar 
Collectors Facilities - Non-Residential / Fewer than 2MW - Application Fee$1,000.00
Amendment to Accessory Ground Mounted & Building Mounted Solar Collectors Facilities-Non-Residential / Fewer than 2MW-Application Fee$500.00
Principal Solar Collectors - Application Fee$1.00/acre
(Minimum $5,000)
     Construction Permit Fee$1,000.00/MW
BESS - Application Fee$1.00/acre
(Minimum $5,000)
     Construction Permit Fee$1,000.00/MW
     Appeal persuant to Sec. 4-860(F)(4)$350.00
Major Amendment
     Principal Solar Facilities, BESS & Wind Energy Facilities
100% of application fee for original land use permit application
Minor Amendment
     Principal Solar Facilities, BESS & Wind Energy Facilities
50% of application fee for original land use permit application
Principle Ground-Mounted Solar Facilities, BESS and Wind Energy Facilities
Renewal Application Fees
 
     One year renewal33% of application fee for original permit application
     Two year renewal66% of application fee for original permit application
     Three year renewal100% of application fee for original permit application

CostFee
Non-residential / Non-commercial Construction Fee$200.00